Call
(940) 668-2573
Contact
marketing@pondking.com
Store info

OPEN:

Monday-Friday, 8am-5pm

Saturday, 8am-1pm

Closed:

New Year's Day

Memorial Day

Fourth of July

Labor Day

Thanksgiving Day

Thanksgiving Friday and Saturday

Christmas Day

Directions

5924 US-82, Gainesville, TX 76240

5924 US-82, Gainesville, TX 76240

OPEN:

Monday-Friday, 8am-5pm

Saturday, 8am-1pm

Closed:

New Year's Day

Memorial Day

Fourth of July

Labor Day

Thanksgiving Day

Thanksgiving Friday and Saturday

Christmas Day

T-Dock (12'x4')

Starting at: $5,345.00

The Standard Steel T-Dock has an approximate weight capacity of 800 pounds and can easily accommodate 2-3 people who are actively fishing. 

All of our steel frame docks are all built using Galvanized 12 gauge steel with 14 gauge C-Purlin bracing on 16 in. centers. The Pond King frames and welds carry a 10-year warranty; the TimberTech Decking won’t crack, split, splinter, or rot, and carries a 25-year limited warranty; and the InsulBead Floats carry a 15-year warranty. These babies are built to last!

Steel Floating Docks are sturdy, durable, and highly customizable

A steel framed floating dock is the right choice for you if you’ve got water levels that fluctuate quite a bit, need a walkway that’s more than 20-feet long, and you want an awning on your dock. Said another way, if you live in Texas of Oklahoma, a floating steel-framed dock is probably the best choice for you.

  • Steel Dock Shipping Information
  • Steel Dock Specifications
  • Steel Dock FAQ
    • The T-Dock Steel-Framed Floating docks are only available in Texas or Oklahoma and are always delivered and installed by Pond King dock specialists. For the most accurate delivery estimate, please call 940-305-0490 or email marketing@pondking.com. For your information, please visit our shipping FAQs page.
    • 3′6″ wide Walkway (10′ or 20′)
    • TimberTech composite decking
    • Foam-filled polyethylene floats
    • Galvanized 12 gauge steel frame
    • 14 gauge C-Purlin bracing on 16″ centers
    • Concreted 8′ bank mount
    • Multiple hinge system allowing dock to float up to 10′ above or below normal water levels
    • How is the dock anchored? All of the Standard Steel Framed Floating Docks are anchored with an 8′ wide steel base set into four 3′ deep piers of fast-setting concrete. There are no cables or pipes needed on standard setups.
    • Once I place an order for a Steel Framed Floating T-Dock, how long will it take to be delivered and installed? The docks are constructed at our shop, loaded onto a trailer, and then delivered and installed at your lake. Since our docks are all made to order, our lead time varies depending on the season. Our average turn-around time is 4-5 weeks, but during peak season it can reach as many as 10-12 weeks. To get an ETA for your dock, please give us a call.
    • Does the decking come in different colors? All docks come standard with Cedar colored TimberTech decking. Other color options may be available for an additional charge. Lead time may vary for special orders. Please call for more options.
    • For more FAQ's please visit our Steel Floating Dock FAQ page

The Proof Is In Our Products